2019 - 2022 - France - Cable Land Fall Works
Trenching of two parallel trenches 2km in length leading into 3no HPDR pipe following the technically challenging directional drilling associated with the project works scope. Post trenching was the installation of 2no High Voltage submarine export cables enabling the connection between the Sofia Offshore windfarm and the UK National Grid. RWE, Prysmian, Port Authorities, ABL Marine Warranty
Managing the overall project quality requirements for the Fécamp offshore cable landings and installation works. The second offshore to onshore renewables cable landing and installation in France and the most challenging due to the constraints within the works location. Piling, demolition, reconstruction, diving operations, sub sea construction, dredging, jack up barges, back filling, bathymetric surveys and processing, civil engineering and reinstatement. Working directly with the various stakeholders to ensure at all times the highest standards of safety and quality. Controlling and planning the cost and budget forecast, plant and personnel and client relations. Prysmian, RTE, Artelia, Port Authorities, Société Nationale de Sauvetage en Mer, Électricité de France
Quality management of the various packages of works from offshore subsea surveys, offshore subsea UXO investigation and clearance operations. Installation of various navigational aids and markers, planned dredging, tunnelling, offshore shaft excavation, water intake and outfalls. Managing client relationships, commercial management of contracts, stakeholders and subcontractors. Working remotely while also traveling as required to the UK for project development. EDF, Nuclear New Build, Scaldis, New Wave Solutions, Trinity House, MCA, EA, Jacobs, Mace.
Managing the Saint Nazaire Wind Farm Landfall Project to the highest quality standards. Offshore trench design, dredging and backfilling with specialist plant and vessels acquired from in-house European companies. Launching, sinking and subsea positioning of the HDPE pipe lines into their predetermined offshore / nearshore locations. Working to the French industry regulations at all times while incorporating the stringent offshore quality standards to meet all contractual requirements from both Italian and French corporate clients. Phase 2 scope of works is the cable pull from the offshore transformer location to landside including connection to the French national grid. Eiffage, RTE, Prysmian, Herbosch Kierre.
Technical management of the marine operations involved to enable the construction of the Lower Thames Crossing, 2No of 4km tunnels beneath the river Thames. Planning, selection, procedures, Geotechnical investigation. Management of associated technically challenging marine operations while working to the highest of international standards set by operational partners below. Highways England, CH2M, COWI, Arcadis, Aecom, Environment Agency, Port of London Authority, International Maritime Organisation.
Managing the daily and planned operations of various marine construction works across the River Thames to the highest standards of industry quality. Organising and implementing control of planned output, budget spending, logistics, and engineering effectiveness of the marine operations while working and adhering to the highest standard of safety and efficiency. Including the largest ever to navigate the Thames River. Large Diameter CFA piling within cofferdam cells. Decommissioning and demolition of various installations on the River Thames. Numerous dredging and tidally restricted diving operations. cofferdams. London, United Kingdom. Costain, VINCI, Bachy Soletanche, Volker Wessels, Ravenstein, Briggs Marine, Arup, London Offshore Consultants, Beckett Rankine, Red 7 Marine, EA, Port of London Authority, International Maritime Organisation.
Quality Management, ocean going tugs, and ocean going DP1 multi cats, marine supervisors, marine engineers, HSE managers, marine surveyors, saturation divers, ROV crews.
Coordinating all contractors to ensure the highest standards of safety and quality were adhered to during each offshore project. Managing offshore works, subsea construction, saturation diving with on board decompression chambers.
HSE reporting in line with the stringent offshore & mining standards. Mobilising and de mobilising of the associated sub-sea construction equipment. Completion of the largest diameter offshore shafts in the world. Seabed levelling with subsea excavators.
Tunnelling from shore to each shaft and the recovery of the MTBM’s from each of the three shafts. Structural subsea installations, subsea concrete pouring and commissioning of systems constructed by Geocean Entropose (€280m). Projects include the Escondita Water Supply, Chile, BHP Billiton, Bechtel, Fugro, Bessac, Black & Veatch, VINCI.